Ashesi University Signage & Wayfinding
Floor plans551
Ashesi University · STEM Innovation Centre, Berekuso

Signage & Wayfinding Proposal

Full system: site to room · Tender-stage design intent

551signs specified
19types, five families
5levels, eight blocks
9,631m² gross internal area

Prepared against Sutherland & Sutherland Revision 02 drawings, April 2023 · August 2026

Scope

What this package covers

A complete signage and wayfinding system for the STEM Innovation Centre, from the vehicular approach to the braille on a laboratory door — designed so that it can go to tender before a single space has been named.

In scope

  • Exterior building identification and site directional signage
  • Vehicular and pedestrian routing from the car park, Engineering, the Quad and campus links
  • Interior wayfinding across all five levels and eight blocks
  • Tactile and braille room identification to every named space
  • Regulatory, fire and laboratory hazard signage
  • Named-space and donor recognition architecture

Excluded or provisional

  • Butterfly Sanctuary interpretation — confirm ownership
  • Multi-Purpose Building internal signage
  • Digital display hardware and content management
  • Glass manifestation — a provisional sum pending the final glazing schedule
  • Statutory fire strategy drawings, issued by others

Basis of design

  • Sutherland & Sutherland Revision 02, April 2023 — 37 sheets
  • Accommodation schedule, 9,631 m² across 5 levels
  • Ghana National Building Regulations LI 1630 (Reg. 75, exit signs)
  • Ghana Persons with Disability Act, 2006 (Act 715)
  • ISO 21542 and ADA Chapter 7 for tactile and visual character specification
  • Ashesi University Brand Guidelines, January 2026

Quantities in this proposal are measured from the Revision 02 drawings and are for tender pricing. They are re-measured against construction issue before fabrication.

The building we are signing

9,631
gross internal area
5
levels, basement to mezzanine
8
blocks — four pavilions, four linking bars
~130
named spaces requiring a door plate
4.2m
fall across the site between entry levels
BlockCharacterLevelsPrincipal contents
A · B · C · DCorner pavilions, rotated 45° — each a large teaching space plus a 146–162 m² foyer with nooksA/B/C: LG, G, 1
D: G, 1
Large Classrooms 1–6 (77 seats), Biochemistry Lab, CSIS Computing Lab, Robot Testing Area, MSc Computer Science Lab, Engineering Lab, Research Labs 01–04
A1 · B1 · C1 · D1Linking bars forming a continuous ring around the courtyardA1/B1: LG, G, 1
C1: G, 1, M
D1: G, 1
Reception, Research & Innovation Collaborative, Anatomy & Physiology Lab, 120-seat classroom, Engineering Programme classrooms, faculty and lecturers’ offices, President’s Office, administration, Main and Upper Library
BasementBeneath Block B only — restrictedBMechanical and Electrical Plant Rooms, I.T. Room, Store, water tanks
Analysis

Six problems this building sets

The architecture is elegant and, for a first-time visitor, genuinely disorienting. These six conditions drive every decision that follows.

01

Four pavilions that look identical

Blocks A, B, C and D are the same rotated square with a foyer of near-identical size. Nothing in the architecture tells you which one you are standing in.

02

No single arrival level

The site falls about 4.2 m. You can enter at Lower Ground (EGL 351) from the car park, at Ground (EGL 355.2) from the Quad and Engineering, and cross to the Multi-Purpose Building higher still.

03

A Lower Ground that stops halfway

Lower Ground covers Blocks A, A1, B, B1 and C only. Anyone walking the ring at that level meets a dead end at Block C.

04

Public and restricted uses interleaved

The President’s Office, Conference Room and senior administration sit on the first floor directly above open teaching space, reached through the same corridors.

05

A courtyard ring with no strong front

Circulation is continuous on Ground and First. That is good for movement and poor for orientation — there is no natural “you have arrived” moment.

06

Destinations that live outside the building

Drawings reference Engineering, The Hive, the Incubator, the Multi-Purpose Building, the Health Centre and the Quad. Signage has to hand people off to the wider campus.

Strategy

Orient, direct, confirm — then name

Wayfinding fails when signs are added where there is wall space rather than where people make decisions. The system is built around three moments, in order, with naming deliberately held back to a fourth.

01

Orient

At every threshold

Every entrance states the building, the level you are entering and the pavilion you are standing in. Because there is no single arrival level, every door has to do the work a main entrance would normally do alone.

02

Direct

At every decision point

Signs sit where the route branches — pavilion corners, lift lobbies, stair landings, the courtyard ring — and nowhere in between. Maximum five destinations per sign, ordered consistently.

03

Confirm

At arrival

Every named space carries a plate readable by sight and by touch, at a consistent position on the latch side of the door, with a room number that never changes even when the name does.

04

Name

Last, and reversibly

Naming and donor recognition sit on top of a system that already works without them. No sign depends on a name being decided before it can be fabricated.

Before fabrication

Three decisions to settle first

Each of these is cheap to decide now and expensive to change once plates are cut. None of them requires a name to be chosen.

Decision 1 — settle the level names

The site falls about 4.2 m across the building, so people arrive on different levels from different directions and each believes they have arrived at the ground floor. Level naming has to be fixed once and used identically on signage, lift call panels and fire plans.

LevelCodeDatumExtent and arrival
BasementB−7200Block B only — internal, restricted
Lower GroundLG−4200 · EGL 351Blocks A, A1, B, B1, C — car park walkway
GroundG±0000 · EGL 355.2All eight blocks — Quad, Engineering, ramps
First1+4200 · EGL 359.4All eight blocks — Multi-Purpose Building link
MezzanineM+8400 · EGL 363Block C1 only — via the library
Every entrance carries a level plate

Sign type E4 states the level you are entering and the two or three things reachable without changing level. This is the single highest-value intervention in the building: it costs little and removes most of the confusion caused by the slope.

STEM INNOVATION CENTRE
Lower Ground
  • Reception
  • Large Classrooms 1 and 2
  • Research & Innovation Collaborative
  • Biochemistry Laboratory
Ground and First floors ▲ lift and stairs, Block B1
E4 · Entrance level plate — worked example

Aluminum plate, 600 × 900 mm, column-mounted at 1400 mm to center. Cap height 30 mm for the level name, 14 mm for the destination list.

Decision 2 — adopt a room numbering convention

A fabricator cannot price or produce door plates without a unique reference per space, and Facilities cannot maintain the system later without one. The number is permanent; the name sitting above it is not.

SICBuildingSTEM Innovation Centre
GLevelB · LG · G · 1 · M
CBlockA · A1 · B · B1 · C · C1 · D · D1
01SequenceClockwise from the courtyard
ReferenceSpace as drawnLevelBlock
SIC-LG-C-01Biochemistry Laboratory, 64 students, 183 m²Lower GroundC
SIC-G-C-01CSIS Computing Laboratory, 64 students, 183 m²GroundC
SIC-G-C1-01Large Tiered Classroom, 120 students, 257 m²GroundC1
SIC-1-B1-01President’s Office, 46 m²FirstB1
SIC-1-C1-01Main Library, 492 m²FirstC1
SIC-M-C1-01Upper LibraryMezzanineC1

Confirm with Facilities and the Registry whether an existing campus convention must be inherited before this is adopted.

Decision 3 — give each pavilion an identity

Four identical rotated pavilions are the building’s hardest wayfinding problem. Each is assigned a letter, a color from the Ashesi palette and — once naming is settled — a name. Color is always a reinforcement, never the only cue.

A

Rajah

#FBAC49 Black text · 8.62:1 · AAA
B

Turquoise

#017597 White text · 5.26:1 · AA
C

Sky Blue

#85A9D2 Black text · 6.68:1 · AA
D

Chocolate

#603913 White text · 10.04:1 · AAA
Text color is specified per pavilion

White on Sky Blue fails at 2.44:1 and is prohibited. Each accent carries the text color listed above and no other.

Lightness, not hue, does the work

Rajah and Chocolate share a warm hue but sit at opposite ends of the lightness scale, as do Sky Blue and Turquoise. The pairs stay distinguishable under the common color vision deficiencies.

Three colors per sign, never more

Any individual sign uses Ashesi Red, Black and one pavilion accent — exactly the brand limit. The four accents coexist across the system, not within a single plate.

The system

Five sign families, nineteen types

551 signs in total, excluding glass manifestation. Every type is specified to material, size, mounting height and finish — select a family to see the full schedule, or open any type on the floor plans.

E

Exterior & site

25 units

Everything read before you are inside the building — identification at the approach, vehicle routing, campus fingerposts and the level statement at each of the ten entrances.

W

Wayfinding

89 units

Directories, directional signs, pavilion identification and level markers. Placed only where a route branches, never where there merely happens to be wall.

I

Identification

164 units

Every named space carries a plate readable by sight and by touch, at a consistent position on the latch side of the door.

R

Regulatory & safety

217 units

Fire and escape, laboratory hazard and PPE, restricted access, and accessibility information. The largest family, and the one governed by statute.

N

Naming & recognition

56 units

Named-space plates, donor walls, dedication plaques and interpretive graphics — built as inserts so no sign waits on a naming decision.

Full specification, by family

EExterior & site

E1
Building identification
3 units

Building identification at the vehicular approach and the Quad frontage

Size
2400 x 600 mm
Construction
10 mm aluminum letters, individually pinned, powder-coated; halo-lit at the north face
Mounting
Wall-fixed on standoffs, 2400 mm to baseline
Cap height
250 mm
Show all 3 on the floor plans →
E2
Vehicular directional
4 units

Vehicular routing, car park entry, exit and accessible bays

Size
600 x 900 mm
Construction
3 mm marine-grade 5005 aluminum on 76 mm dia. galvanized post
Mounting
Post-mounted, face at 1800 mm
Cap height
60 mm
Show all 4 on the floor plans →
E3
Pedestrian fingerpost
8 units

Pedestrian fingerpost at each campus link — Engineering, The Hive, the Incubator, Multi-Purpose Building, car park, Quad, Health Centre road

Size
1800 x 300 blades on 2600 post
Construction
100 × 50 SHS galvanized post, powder-coated; double-sided aluminum blades
Mounting
Concrete foundation, lowest blade 1600 mm
Cap height
60 mm
Show all 8 on the floor plans →
E4
Entrance and level plate
10 units

Entrance identification and level statement at every building entrance

Size
600 x 900 mm
Construction
3 mm aluminum, digitally printed, matt anti-graffiti laminate
Mounting
Column or wall-fixed, 1400 mm to centre
Cap height
30 mm level / 14 mm list
Show all 10 on the floor plans →

WWayfinding

W1
Floor directory
14 units

Floor directory and orientation board at each vertical core and at reception

Size
900 x 1200 mm
Construction
3 mm aluminum tray, 25 mm return, printed face with matt laminate; changeable center panel
Mounting
Wall-fixed, centre 1500 mm; lowest line 900 mm
Cap height
40 mm head / 16 mm list
Show all 14 on the floor plans →
W2
Directional
34 units

Directional at corridor junctions, pavilion corners and lift lobbies

Size
Wall 600 x 200 / suspended 900 x 250
Construction
3 mm aluminum, double-sided where suspended, powder-coated edges
Mounting
Wall 1400-2100 mm; suspended 2300 mm clear
Cap height
30 mm
Show all 34 on the floor plans →
W3
Pavilion identification
15 units

Pavilion identification in every foyer and on each courtyard-facing elevation

Size
Interior 450 x 450 / courtyard 900 x 900
Construction
Aluminum panel in pavilion accent with applied letter; courtyard units in cut aluminum
Mounting
Wall or column, 2200 mm interior / 3500 mm courtyard
Cap height
125 / 250 mm
Show all 15 on the floor plans →
W4
Core and level marker
26 units

Level marker at every stair and lift landing

Size
300 x 300 mm
Construction
3 mm aluminum with tactile numeral and braille at the landing side
Mounting
Facing landing at 1500 mm; tactile 1200-1500 mm
Cap height
75 mm visual / 16 mm tactile
Show all 26 on the floor plans →

IIdentification

I1
Room plate, tactile and braille
128 units

Room identification at every named space, readable by sight and by touch

Size
200 x 300 mm
Construction
5 mm acrylic or 3 mm aluminum composite, matt face, maximum 20% gloss; Grade 2 braille, domed cells 1.5 mm dia.
Mounting
Latch side, tactile baseline 1200-1500 mm
Cap height
20 mm number / 25 mm name
Show all 128 on the floor plans →
I2
Zone and open-plan identification
14 units

Zone and open-plan identification where a space has no single door

Size
400 x 150 mm
Construction
5 mm acrylic or 3 mm aluminum composite, matt face, wall or suspended
Mounting
Wall or suspended, 2000 mm
Cap height
30 mm
Show all 14 on the floor plans →
I3
Nook, pod and interactive
22 units

Nook, pod and interactive-space identification in foyers and the courtyard

Size
150 x 150 mm
Construction
5 mm acrylic or 3 mm aluminum composite, wall or furniture-mounted
Mounting
Wall or furniture-mounted, 1400 mm
Cap height
16 mm
Show all 22 on the floor plans →

RRegulatory & safety

R1
Fire and escape
120 units

Escape route directional at maximum 15 m centers, final exit identification, fire action notices, extinguisher and hose reel identification, assembly point

Size
Per ISO 7010 / ISO 16069
Construction
Photoluminescent rigid PVC, Class C, for route marking; maintained LED luminaires at final exits, 3-hour duration
Mounting
Above door 2000 mm; route signs at max 15 m centers
Cap height
Per viewing distance
Standard
LI 1630 Reg. 75 · ISO 7010 graphical symbols · ISO 16069 for low-level way-guidance
Show all 120 on the floor plans →
R2
Laboratory hazard and PPE
45 units

Laboratory hazard identification, mandatory PPE, emergency shower and eyewash location, out-of-hours working restriction, waste segregation

Size
300 x 400 mm
Construction
3 mm aluminum or 5 mm acrylic, chemical-resistant printed face, wipe-clean
Mounting
Beside door, 1500 mm to centre
Cap height
16 mm
Standard
ISO 7010 · GHS pictograms where chemicals are stored
Show all 45 on the floor plans →
R3
Restricted access and plant
32 units

Authorized access only at plant, server, water tank, store, attic and janitor spaces; statutory electrical notices

Size
200 x 300 mm
Construction
3 mm aluminum, mechanically fixed, tamper-resistant
Mounting
On door leaf, 1500 mm
Cap height
16 mm
Standard
ISO 7010 · Ghana Energy Commission wiring notice requirements
Show all 32 on the floor plans →
R4
Accessibility and assistance
20 units

Accessible route marking, accessible WC identification, emergency assistance alarm instructions, evacuation refuge information at lift lobbies

Size
200 x 300 mm
Construction
3 mm aluminum with tactile symbol and braille where door-mounted
Mounting
Latch side, tactile 1200-1500 mm
Cap height
16 mm
Standard
Act 715 · ISO 21542 · ISO 7010
Show all 20 on the floor plans →

NNaming & recognition

N1
Named-space plate (carrier + insert)
40 units

Named-space plate at any of the 40 nameable spaces. Carrier installed with the main contract; insert produced on confirmation of the gift

Size
200 x 300 mm insert
Construction
Insert to the I1 carrier — no separate substrate, no additional fixing
Mounting
Integral with I1 carrier
Cap height
25 mm
Show all 40 on the floor plans →
N2
Donor recognition wall
2 units

Donor recognition wall. Primary at the Lower Ground Reception in Block A1, the first interior most visitors see; secondary in the Main Library, Block C1

Size
Modular, 2400 x 1200 mm nominal
Construction
Modular panels on a fixed rail, so contributors are added without refabricating the wall
Mounting
Fixed rail, panels added over time
Cap height
Varies
Show all 2 on the floor plans →
N3
Dedication plaque
2 units

Dedication plaque at the building entrance, Quad frontage, Block C1

Size
400 x 600 mm
Construction
Cast or etched, permanent, single-issue
Mounting
Wall-fixed at 1500 mm
Cap height
20 mm
Show all 2 on the floor plans →
N4
Interpretive graphic
12 units

Interpretive and story graphics — the work of the center, the people in it, and the sanctuary’s ecology

Size
1200 x 800 mm
Construction
Printed panel, wall-fixed or freestanding; the Ashesi pattern may appear as an accent, never under type
Mounting
Wall or freestanding
Cap height
Varies
Show all 12 on the floor plans →
Specification

The room plate, in detail

The I1 room plate is the most numerous single type in the building at 128 units, and the one every occupant touches. Its anatomy is fixed; only the insert changes.

BLOCK C
SIC-G-C-01
CSIS Computing
Laboratory
Changeable insert — named space
⠉⠎⠊⠎ ⠇⠁⠃
I1 · Room plate anatomy
  • Pavilion accent band, 42 mm — color identifies the block
  • Room number in Ashesi Red, permanent, 20 mm cap height
  • Space name, 25 mm cap height, on a changeable insert
  • Grade 2 braille, domed 1.5 mm dia., baseline 1200–1500 mm
ItemSpecification
Type & sizeI1 room plate 200 × 300 mm · I2 zone panel 400 × 150 mm · I3 nook and pod plate 150 × 150 mm
Substrate5 mm acrylic or 3 mm aluminum composite, matt face, maximum 20% gloss to eliminate glare
Tactile charactersRaised 0.8 mm minimum, radiused profile, sans-serif upper and lower case, 16 mm cap height minimum
BrailleGrade 2 English, domed cells 1.5 mm diameter, 0.6–0.9 mm height, Marburg Medium spacing, positioned below the tactile text
Mounting heightTactile baseline 1200–1500 mm above finished floor level
Mounting positionLatch side of the door, 50–100 mm clear of the architrave. Where there is no clear wall, on the nearest adjacent wall on the latch side
Double doorsSingle active leaf — plate on the inactive leaf. Both leaves active — plate to the right of the opening
ContrastMinimum 4.5:1 character to background and 3:1 plate to wall. Black on Beige at 13.15:1 is the standard combination
FixingConcealed adhesive pad plus two stainless mechanical fixings; insert removable without disturbing the carrier
QuantityI1 128 · I2 14 · I3 22 — 164 units total
Placement

Where the signs go, level by level

Every one of the 551 signs is positioned on the drawings. Open the interactive floor plans to see them in place, or read the level-by-level intent below.

Open the interactive floor plans All 551 signs, positioned on the Revision 02 drawings. Filter by family or type, and click any marker for its specification.

Exterior and site

North — vehicular arrival

  • E1 building identification on the north face, halo-lit, read from the access road at ~50 m
  • E2 at the car park entry and exit, with accessible bay marking
  • E3 at both walkway heads leading south from the car park to Blocks A1 and B
  • E4 at the Lower Ground entrances to Blocks A, A1, B and B1

West — Engineering link

  • E3 fingerpost at the existing Engineering forecourt, facing both ways
  • E4 at the Block D1 and Block D Ground entrances
  • Reciprocal blade on the Engineering side so the route reads in both directions

South — the Quad

  • E1 building identification on the Block C1 Quad frontage, unlit
  • E3 at the head of the covered walkway to The Hive
  • E3 at the steps to the Incubator, Block C
  • E4 at the Block C1 covered ramp and the Block C and D ramps
  • I3 pod identification at the five courtyard pods and the access-controlled lift

East — sanctuary and Multi-Purpose Building

  • E3 at the Multi-Purpose Building link and on the Health Centre / Berekuso road
  • E4 at the Block B and B1 east entrances
  • N4 interpretive panel at the Butterfly Sanctuary edge — subject to confirming who owns that content
LG

Lower Ground

Level 2 of 5

Reached from the car park walkway. Covers Blocks A, A1, B, B1 and C only — the ring is incomplete and the route dead-ends south of Block C.

BlockPrincipal spacesSign types
ALarge Classroom 1 · 77 seats · foyer 162 m² E4W2W3I1R1
A1Reception & Waiting Lobby · Meeting Room, 25 seats · Open Plan Office, visiting staff · washrooms E4W1W2I1I2R1R4
BLarge Classroom 2 · 77 seats · foyer 162 m² E4W2W3I1R1
B1Research & Innovation Collaborative, 276 m² · Cubicles 01–04 · lift and stair core · accessible WC E4W1W2W4I1I2R1R4
CBiochemistry Laboratory · 64 seats · two stores W2W3I1R1R2
Watch points
  • The main visitor arrival is here, at the Block A1 Reception. It carries the primary W1 directory and the N2 donor wall.
  • Block A1 has no accessible WC on this or any level. W2 and R4 must route to the accessible WC in Block B1.
  • South of Block C the level ends. A W2 at the Block C foyer states clearly that Blocks C1, D and D1 are reached via Ground.
G

Ground

Level 3 of 5

The only level present in all eight blocks, and the level most people will think of as the front door. Entered from the Quad, from Engineering and via the ramps at Blocks C, C1 and D.

BlockPrincipal spacesSign types
A / A1Large Classroom 3 · Open Plan Office, 44 faculty interns · Academic HOD 01 and 02 E4W1W2W3I1I2R1
B / B1Large Classroom 4 · Anatomy & Physiology Lab · Additional Classroom/Lab · lift core E4W1W2W3W4I1R1R2R4
CCSIS Computing Laboratory · Robot Testing Area · Server Room · steps to the Incubator E3E4W2W3I1R1R2R3
C1Large Tiered Classroom, 120 seats · Quad frontage · covered walkway to The Hive E1E3E4W1W2I1R1R4
D / D1MSc Computer Science Lab · two Engineering Programme classrooms · Engineering link E3E4W1W2W3W4I1R1R2R4
QuadFive pods, 5–11 m² · access-controlled lift · sculptural columns E3I3R3R4
Watch points
  • The courtyard ring is continuous here. W3 pavilion identification on each courtyard elevation is what stops people circling.
  • The access-controlled lift in the Quad needs R3 access signage and R4 assistance information at both the Quad and Ground stops.
  • Classroom walls carrying the board and projector screen are unavailable for mounting — plates go on the corridor side.
1

First

Level 4 of 5

The densest level for room identification: 61 named spaces, mixing teaching, research, senior administration and the Main Library.

BlockPrincipal spacesSign types
A / A1Large Classroom 5 · Lecturers’ Open Plan Office, 211 m², with twelve individual offices · lounge W1W2W3I1I2R1
B / B1Large Classroom 6 · President’s Office and Assistant · Waiting Lobby · Conference Room, 25 seats W1W2W3W4I1R1R4
CResearch Space, 183 m² · Laboratories 01–04 · store W2W3I1R1R2
C1Main Library, 492 m² · e-Library · Librarian’s Office · Interactive Zone, 174 m² W1W2W4I1I2I3R1R4N1
D / D1Engineering Laboratory · Open Plan Office · COO · General Counsel · Chief of Staff · Comms W1W2W3W4I1I2R1R2R4
Watch points
  • Visitors to the President’s Office arrive at Lower Ground reception and travel two levels. That journey needs a continuous, named thread from the front door to the waiting lobby.
  • Library signage is its own subsystem spanning First and Mezzanine — collections, quiet zones, bag store and the e-Library.
  • Twelve lecturers’ offices in one open-plan suite need I2 zone identification as well as individual I1 plates.
B · M

Basement & Mezzanine

Levels 1 and 5 of 5

Two restricted or specialized levels at either end of the section. Neither carries general wayfinding; both carry regulatory and access signage.

BlockPrincipal spacesSign types
Basement, Block BMechanical Plant Room · Electrical Plant Room · I.T. Room · Store, 85 m² · two water tanks W4I1R1R3
Mezzanine, Block C1Upper Library · washrooms · Attic Storage, 270 m² · lift W1W4I1I2R1R3
Watch points
  • The basement is authorized access only. R3 restricted-access signage at every door, with statutory electrical and mechanical plant notices.
  • Attic Storage at 270 m² is a significant volume with a single access point — confirm its escape strategy before finalizing R1.
  • The Mezzanine is reached only through the library, so its directory is a library directory, not a building one.
R2 · Laboratory and technical

Thirteen technical spaces, each with its own hazard set

Hazard signage is specified per space rather than per building, because the sets genuinely differ — a computing laboratory and a biochemistry laboratory share almost nothing.

SpaceLevelEntry hazard panelMandatory PPEEmergency equipment
Biochemistry Laboratory, 64LG · CBiological and chemical, GHS pictograms per inventoryLab coat, eye protection, glovesShower, eyewash, spill kit, first aid
Anatomy & Physiology Lab, 50G · B1Biological, specimen handling, no food or drinkLab coat, glovesEyewash, sharps disposal, first aid
Additional Classroom / Lab, 50G · B1To be confirmed once the final use is fixedTo be confirmedEyewash, first aid
CSIS Computing Laboratory, 64G · CElectrical, at the distribution point onlyNoneCO₂ extinguisher, first aid
Server RoomG · CRestricted access, electrical, suppression systemNoneSuppression notice, isolation point
Robot Testing Area, 146 m²G · CMoving machinery, entanglement, keep clear in useEye protection, closed footwearEmergency stop, first aid
MSc Computer Science Lab, 64G · DElectrical, at the distribution point onlyNoneCO₂ extinguisher, first aid
Engineering Laboratory, 641 · DMachinery, noise, hot work, eye hazardEye and hearing protection, closed footwearEmergency stop, extinguisher, eyewash
Research Laboratories 01–041 · CChangeable insert, set by the principal investigatorPer laboratoryEyewash, spill kit, first aid
Research Space, 183 m²1 · CLaboratory discipline, no lone working out of hoursAs posted at each benchFirst aid, nearest eyewash
Mechanical & Electrical PlantB · BAuthorized access, electrical, mechanical, confined spaceAs postedIsolation points, first aid
I.T. RoomB · BRestricted access, electricalNoneIsolation point
Water Tanks, 2 no.B · BConfined space, permit to work requiredAs postedIsolation and permit board

Research Laboratories 01–04 use a changeable hazard insert so the panel tracks the work actually being done rather than the work anticipated at design stage. All sets to be confirmed against departmental risk assessments before artwork.

The one that will be missed: motion-sensor lighting on escape routes

The sustainability strategy specifies motion sensors for lighting throughout. A non-maintained emergency luminaire on a corridor controlled by a passive infrared sensor leaves an unlit escape route the moment the corridor is empty — which is exactly the condition in which an alarm is most likely to go unnoticed. All escape signage is therefore specified as maintained, permanently illuminated at 3-hour duration, and supplemented with photoluminescent low-level way-guidance to ISO 16069 along the courtyard ring on Ground and First. This must be agreed with the electrical engineer before the M&E package is frozen.

N series · Naming architecture

Designing for names that do not exist yet

Naming and donor recognition have not been decided, and will keep evolving after the building opens. Rather than delay the package or commit to names that may change, every sign that could ever carry a name is built in two layers.

Layer 1 — the carrier

Fabricated and installed with the main contract
  • Room number, permanently applied
  • Pavilion accent band and block letter
  • Braille and tactile characters for the number
  • A machined slot sized for the insert

Layer 2 — the insert

Produced later, as names are confirmed
  • Space name and any donor attribution
  • Braille and tactile characters for the name
  • Removable and replaceable in under a minute, without tools that damage the carrier
  • Ships in a generic descriptive version at handover — “Biochemistry Laboratory” — so nothing is blank on day one

What this buys the university

The tender can proceed now

Nothing in the package waits on a naming decision. Carriers are priced and fabricated against a fixed, complete schedule.

A name change costs an insert

Not a sign. The difference is roughly one order of magnitude per unit, and no wall is redrilled.

Recognition can grow

N1 named-space plates can be added to any of the 40 nameable spaces as gifts are confirmed, over years, without a new procurement.

The building never looks unfinished

Descriptive inserts at handover mean no blank plates and no printed paper taped to doors while decisions are pending.

Recognition — placed with restraint

TypeLocationDescriptionQty
N1Any of the 40 nameable spaces — seven large classrooms, seven laboratories, the Research & Innovation Collaborative, Main and Upper Library, Interactive Zone, Conference Room, four pavilion foyers, the Quad and five podsNamed-space plate. Carrier installed with the main contract; insert produced on confirmation of the gift40
N2Primary: Lower Ground Reception, Block A1 — the first interior most visitors see. Secondary: the Main Library, Block C1Donor recognition wall. Modular panels on a fixed rail, so contributors are added without refabricating the wall2
N3Building entrance at the Quad frontage, Block C1Dedication plaque. Cast or etched, permanent, single-issue2
N4Pavilion foyers, the courtyard, the Butterfly Sanctuary edge and the Main LibraryInterpretive and story graphics — the work of the center, the people in it, and the sanctuary’s ecology12
Recognition never competes with wayfinding

A donor name sits below the room number and the space name, never above.

Gratitude with dignity

The tone is warm and specific, naming what the gift makes possible rather than the sum given.

The Ashesi seal does not appear on signage

It is reserved for diplomas, certificates and awards. Confirm with University Communications if the dedication plaque is to be an exception.

Governance after handover

  • Facilities holds a live sign register keyed to the room numbers, updated whenever an insert changes.
  • The signage subcontractor is retained under a call-off order for variations, so inserts stay consistent for years rather than drifting between suppliers.
  • Twenty blank inserts held in stock, and a stated policy that no printed paper notice is fixed to a door or wall. Every building loses its signage system this way.
Design considerations

Legibility, accessibility, materials, brand

Legibility — sized from viewing distance

Cap height is calculated, not chosen. Minimum is viewing distance divided by 250; preferred is divided by 200. Every sign in the schedule carries a cap height derived from where it is actually read.

Read fromMinimumSpecifiedApplies to
Touch, at the door16 mmI1 tactile characters, W4 tactile numerals
3 m12 mm20 mmI1 room number, W1 directory listings
6 m24 mm30 mmW2 directional, E4 level name
12 m48 mm60 mmE2, E3 blades, W4 visual level numerals
25 m100 mm125 mmW3 pavilion identification, interior
50 m200 mm250 mmE1 building identification, W3 courtyard
  • Stroke thickness between 10% and 30% of cap height; character width 55–110% of height
  • Upper and lower case for all running text — capitals throughout reduce word-shape recognition and slow reading
  • Matt finish throughout, maximum 20% gloss, to eliminate glare from the courtyard and the curtain walling
Aa Bb Cc
1234567890
PoppinsSemiBold for primary, Regular for secondary

Poppins is one of the three approved Ashesi typefaces and the only one suited to signage. Garamond Premier’s fine serifs break down at distance and in raised tactile form; Candara’s calligraphic stroke modulation does the same.

One caution

Poppins is a geometric sans, so capital I, lowercase l and the numeral 1 are near-identical. Specify the disambiguated alternates, or test a sample plate with the room numbers most affected before bulk fabrication.

Accessibility — beyond the braille plate

The accessible route is not the short route

At Blocks C, C1 and D the accessible approach is the ramp, and in the Quad it is the access-controlled lift. Directional signage marks the accessible route explicitly wherever it diverges from the direct one, and floor directories show it as a distinct line.

Reach and read from a seated position

Floor directories place their lowest readable line at 900 mm and their highest at 1600 mm. Tactile plates sit in the 1200–1500 mm band. Nothing critical is above 1600 mm.

Lifts and refuge

Four cores carry lifts — B1, C1, D1 and the Quad. Each lift lobby needs evacuation refuge information and, where a refuge is provided, two-way communication instructions in tactile and visual form.

Access control needs an alternative

The Quad lift is access-controlled. Its signage must state how someone without a credential obtains assistance, and where the alternative accessible route runs.

Raised with the design team: no accessible WC in Block A1

Blocks B1, C1 and D1 each provide an accessible WC on the levels they serve. Block A1 — the northern bar containing Reception, the visiting-staff office, the faculty interns’ office and the twelve lecturers’ offices — shows only a female WC, a male WC, a lobby and a janitor’s store on Lower Ground, Ground and First. A visitor arriving at Reception and needing an accessible WC must cross to Block B1. Signage can direct that journey clearly, and will, but the condition is worth confirming as intentional while it is still inexpensive to change.

Materials — specified for Berekuso

ConditionConsequenceSpecification
High UV, year roundPrinted graphics fade and substrates chalk within two to three years if unratedUV-stable pigment inks with a minimum 10-year outdoor warranty; matt anti-graffiti over-laminate on all printed faces
Two rainy seasons, high humidityWater tracks behind faces and corrodes fixings from insideSealed edges throughout, weep provision in tray signs, no untreated mild steel anywhere in the package
Harmattan dust, December to FebruaryHorizontal ledges collect abrasive dust that scours faces during cleaningNo upward-facing ledges in any profile; radiused top edges; faces cleanable with water and a soft cloth alone
Open, naturally ventilated corridorsSignage nominally interior is exposed to weather across the courtyard ringAll W-series signage specified to full exterior standard, including the ring corridors on Ground and First
Coastal-adjacent atmosphereStandard stainless pits and stains at fixingsA4 grade 316 stainless fixings throughout; concealed where the substrate allows
Curtain walling and Low-E glazing to foyersLarge glazed areas leave little solid wall for mounting, and glazed units cannot be drilledColumn-mounted, suspended or freestanding solutions in foyers; applied film only on glass; no penetration of any glazed unit
Standard exterior build-up, all E and W series

3 mm marine-grade 5005 aluminum · polyester powder coat to BS EN 12206-1, matt, maximum 20% gloss on all reading faces, color matched to the Ashesi palette · digitally printed graphics in UV-stable ink · matt anti-graffiti over-laminate · sealed edges · A4 stainless fixings · freestanding units on 100 × 50 SHS galvanized posts set in concrete with 600–700 mm embedment.

Brand — applied, not decorated

Do

  • Ashesi Red, Black and one pavilion accent — exactly three colors on any single sign
  • Poppins throughout, SemiBold for primary information and Regular for secondary
  • The horizontal logo lockup on E1 and E4 only, at 66 mm minimum width in print
  • Beige as the standard plate background — 13.15:1 against black text, and warmer than white against the building’s brick and tile
  • Plain, specific language: “Biochemistry Laboratory”, not “Bio Lab”
  • American English throughout, per the brand standard

Do not

  • The Ashesi seal on any sign — it is reserved for diplomas, certificates and awards
  • The Ashesi pattern behind text — it may appear as an accent on N2 and N4 recognition pieces only, and never under type
  • Departmental lockups without University Communications Office approval, which must be requested before artwork is issued
  • More than two typefaces, or any substitute where Poppins is unavailable to the fabricator
  • Color as the only means of identifying a pavilion — always paired with the letter and, later, the name

Departmental lockup approval sits on the critical path — it is a University Communications decision, not a fabricator one, and should be requested at the same time the tender is issued.

Delivery

Coordination, quantities and phasing

Resolve before the tender is frozen

Six items sit with other consultants and become expensive or impossible to fix after their packages close.

WithItemWhy it cannot wait
Electrical engineerMaintained emergency luminaires at all final exits and escape route signs, plus photoluminescent low-level way-guidance on the courtyard ringLighting is motion-sensor controlled. Non-maintained fittings leave escape routes dark exactly when they are needed
Electrical engineerExternal supply, photocell and timeclock to the halo-lit E1 at the north faceThere is no other opportunity to run a supply to that elevation once the façade is complete
Electrical & ITPower and structured cabling at high level to the Reception directory and the Main Library directory, whether or not digital displays are installed at handoverProvision costs little now and cannot be added later without opening finished ceilings
Structural engineerFixing points in corridor soffits for suspended W2 signage on Ground and FirstPost-drilling a completed soffit risks reinforcement and voids the finish warranty
Architect / façadeConfirmation that no fixings penetrate curtain walling or Low-E units, and the final glazing schedule for manifestationManifestation is a regulatory requirement and is currently carried only as a provisional sum
Architect / interiorsWall availability in classrooms and foyers, where boards, projector screens and lockers occupy the mountable surfacesEvery large classroom has a board and screen wall; every foyer has lockers. Plate positions must be agreed against the fit-out drawings

Quantity schedule for tender

SetTypeDescriptionBLGG1MExt.Total
E E1Building identification33
E2Vehicular directional44
E3Pedestrian fingerpost88
E4Entrance and level plate4610
W W1Floor directory444214
W2Directional18131234
W3Pavilion identification36615
W4Core and level marker2697226
I I1Room plate, tactile and braille52137614128
I2Zone and open-plan identification337114
I3Nook, pod and interactive410822
R R1Fire and escape62444424120
R2Laboratory hazard and PPE66181545
R3Restricted access and plant9597232
R4Accessibility and assistance487120
N N1Named-space plate (carrier + insert)61616240
N2Donor recognition wall112
N3Dedication plaque22
N4Interpretive graphic353112
Total, excluding glass manifestation 291021901961915551

Glass manifestation is a provisional sum, measured by linear meter once the glazing schedule is issued. Quantities are re-measured against construction-issue drawings before fabrication. This table is generated from the same marker data that drives the floor plans, so the two can never disagree.

Nine queries raised by the drawings

01

Upper Library area

The Mezzanine plan labels the Upper Library 477 m². The accommodation schedule lists Upper Library and Circulation at 396 m². Which governs?

02

Accessible WC in Block A1

None shown on Lower Ground, Ground or First, while B1, C1 and D1 each provide one. Confirm whether this is intentional.

03

Lower Ground extent

Confirm the level does not extend to Blocks C1, D or D1, so the dead-end condition can be signed at the Block C foyer.

04

Campus destination names

“The Hive” and “the Incubator” appear on the Ground Floor Block C and D plans. Are these the official names for signage?

05

Adjacent buildings

Are the Multi-Purpose Building and the Butterfly Sanctuary within this signage package, or separately commissioned?

06

Building name

Will the center itself carry a donor or commemorative name? This governs whether E1 is fabricated now or held to Phase 3.

07

Level nomenclature

Confirm the names in this proposal will be used identically on lift call panels and statutory fire plans.

08

Robot Testing Area

Is this a controlled-access space? It determines whether it takes R2 hazard signage alone or R3 access control as well.

09

Numbering authority

Does Facilities or the Registry own room numbering, and is there an existing campus convention the proposed scheme must inherit?

Phasing and procurement

Phase 0Now

Before tender

Level names, room numbering and pavilion identity agreed. Sign register issued as a tender document. Departmental lockup approvals requested from University Communications.

Phase 1Construction

With the main contract

All carriers, all regulatory and safety signage, all exterior and wayfinding signage. Room plates carry numbers and descriptive names. The building opens fully signed.

Phase 2Completion

At handover

Sign register handed to Facilities as a live document. Twenty blank inserts held in stock. Signage subcontractor retained under a call-off order.

Phase 3Post-occupancy

Rolling

Named-space inserts and donor recognition produced as gifts are confirmed, over years, against the retained call-off. No new procurement, no refabrication.

A single specialist subcontractor

Named or nominated, covering all five families. Splitting the package across suppliers is the fastest way to lose consistency across 551 units.

First-article approval

One prototype of each of the nineteen types approved on site before bulk fabrication, including a tactile plate reviewed by a braille reader.

A sample board

Substrates, powder-coat colors, laminates and print samples approved against the Ashesi palette under daylight, not under studio light.

Next

Five decisions, then this goes to tender

01

Level nomenclature

Approve Basement, Lower Ground, Ground, First, Mezzanine — and confirm the lift and fire consultants will use the same names.

02

Room numbering

Approve the SIC-Level-Block-Sequence convention, or supply the existing campus convention it must inherit.

03

Pavilion identity

Approve the letter-and-color assignment for Blocks A to D, and confirm whether pavilion names will be part of the naming program.

04

Recognition policy

Confirm which of the 40 nameable spaces are available for naming, and where the primary donor wall sits — Reception or the Library.

05

Coordination instructions

Issue the six coordination items to the electrical, structural and façade consultants, starting with the maintained emergency lighting.

Once these five are settled, the sign register and specification can be issued as tender documents without waiting on a single naming decision.

Floor plan
Loading plan…

Location
Size
Mounting
Cap height